GPU colocation means your servers sit in a provider's facility. You pay for space, power, cooling, and the work of running the building. You keep the hardware.
The useful comparison is specific to the workload. A training cluster, an inference fleet, and a smaller research deployment do not need the same room.
Start with the workload
Write down the job before you collect proposals. Name the GPU model, how many servers you expect, and whether they must sit in one hall. Note the network those servers need between racks. Note whether users sit in one region or many.
Training usually cares about a large group of GPUs that can communicate inside the building. Inference often cares about more than one location, closer to the people or services it answers. A smaller deployment may care more about a shorter term and a clear way to add racks later.
That brief is what a provider can quote. GPU capacity is quoted to the hardware and the site. A general note that a building has space is only an opening. Ask for a quote tied to your hardware before you treat any of it as reserved.
Density, in kilowatts per rack
Ask how many kilowatts the provider can deliver to the rack you would actually use. Ask whether that figure describes the room or the circuit at your cabinet.
AI servers draw more power per rack than ordinary enterprise gear. The amount varies by server and by site. A hall built for mixed IT equipment may support only a modest GPU row. A hall built for accelerators may support a much higher draw, often with liquid cooling.
Ask about the breaker, the whip or busway, and whether the neighboring rack shares the same limit. Ask what happens if a later server generation draws more than the circuit you are buying. A proposal that says high density and never states kilowatts is incomplete.
Liquid cooling and air cooling
Air cooling uses fans and room air handlers. It is simpler to install and simpler to work on. It stops being enough when the rack rejects more heat than the airflow can carry.
Direct-to-chip cooling brings liquid to a plate on the processor. Immersion places the server in a fluid. A rear-door heat exchanger sits on the rack and catches heat before it enters the aisle. The server vendor decides which of these the hardware supports. The facility has to match that design.
Ask what is already built and what would be added for you. Ask who owns the coolant distribution units, the secondary loop, and the leak sensors. Ask who maintains them, and what happens if a pump fails. Liquid cooling fits when the rack needs it. It also adds equipment, fluid handling, and a maintenance plan that belongs in the contract.
How the power bill is built
Colocation power is usually several charges. You may see a fee for the rack or the cage. You may see a charge for kilowatts you reserve, a charge for kilowatt-hours you use, or both. Cooling may sit inside the power rate, or it may be a separate fee. Taxes, utility riders, and demand charges may pass through.
Ask whether the rate is fixed, tied to the utility tariff, or a blend, and for how long. Ask what you pay if you use less than you reserved. Ask what you pay if you need more than you reserved. Ask how usage is metered and who owns the meter.
Compare the full monthly cost at the load you expect to run. Ask the provider to show that math. A low headline rate can sit beside a large reservation fee. The mix varies by site, so two quotes with a similar energy figure can still produce different bills.
Location and latency
Inside one training cluster, the network between your racks matters more than the drive to the nearest city. Inference and other user-facing work care about the trip to a specific place. Name that place. It might be a cloud region, an exchange, or the users you serve.
Ask which carriers are already in the building. Ask whether you can bring your own fiber. Ask the provider to describe the path to the destination you named. A latency claim needs that destination attached.
Also ask how long it takes a technician to reach the site, and where spare parts sit. A building with an attractive power price and slow physical access is a different product from a building your team can reach the same day.
Redundancy you are actually buying
Redundancy is a design you pay for. Ask whether power arrives on more than one utility path. Ask whether the site has generators, and what those generators cover. Ask whether your IT load is on UPS, and for which events. Ask whether cooling can stay up while one unit is serviced.
Then ask which of those features are commitments in the contract and which are a description of the building. Concurrent maintainability means the provider can work on one path while your load stays online. Ask the provider to point to the contract language for each feature you are paying for.
Match the design to the job. A training run that can pause has a different outage tolerance from an inference service that has to stay up. Buy the path your workload needs, and get the failure modes in writing.
Contract terms worth reading twice
Read the commercial pages with the same care as the technical ones. Check the length of the term and how renewal works. Check how reserved kilowatts are set, and how you add or release them. Check one-time fees for installation, cross-connects, and remote hands.
- The service level, and the credit if the provider misses it.
- Insurance requirements, including any rules from a lender that has a claim on the GPUs.
- Who may enter the space, and whether the provider can move your equipment to another room.
- Early termination, and what happens to the hardware if either side ends the contract.
Timeline, from quote to live racks
A date on a proposal is a target until the site confirms power, cooling, and a place for your hardware. The work has a sequence. The provider qualifies the load. You agree on space, power, and cooling. Cross-connects and any liquid cooling gear get ordered. The rack is made ready. Your servers ship, land, and come up.
Space that already has the power and the cooling you need follows a different schedule from a hall that still needs electrical work. Ask which parts exist today. Ask what you must deliver, such as a rack drawing, a network diagram, and insurance certificates, and by when. Ask which outside items can move the date, including fiber, equipment delivery, and your own shipping.
A simple way to compare finalists
Put the sites in one table and use the same rows for each. Include kilowatts at the rack, cooling method, the full power charge, metro and carriers, the redundancy in the contract, the term, and the date the rack can take servers. Leave a cell blank until the provider answers it in writing. The provider checklist is a useful way to collect those answers.
Frequently asked questions
What is GPU colocation?
It is an arrangement where your GPU servers run in a provider's facility. You pay for space, power, cooling, and related operations. You continue to own the hardware.
How much power should I plan per rack?
Start with the server vendor's electrical requirements for the exact configuration you will install. Then ask the facility whether that draw is available on the rack you would use. The answer varies by server and by site.
Do I need liquid cooling?
You need the cooling method your servers are built for. Some deployments still use air. If the vendor specifies direct-to-chip cooling or immersion, the facility has to support that design, including the fluid loop and a written maintenance plan.
What belongs in the price besides the power rate?
Include reserved capacity, cooling, installation, remote hands, cross-connects, taxes, and any credit terms tied to the service level. Ask for the monthly total at the load you expect to run.
How long does it take to go live?
It depends on what is already built. A rack with power and cooling in place can move faster than space that still needs construction. Ask the provider to separate finished work from work that is still planned.